Hayratan to Mazar-i-Sharif project details

Asian Development Bank has details of the Hairatan to Mazar-e-Sharif Railway Project. “Interesting to see it all in one place” says Michael G Erickson who spotted it.

The Hairatan to Mazar-e-Sharif railway link is part of the Central Asia Regional Economic Cooperation (CAREC) Program. It fits with Transport Corridors 3 and 6, which connect Central Asia to South Asia and the region to the Caucasus and the Middle East. Although the road between Hairatan and Mazar-e-Sharif has been improved, it cannot meet national and regional traffic needs. A railway from Hairatan to Mazar-e-Sharif will (i) improve links between Afghanistan and neighboring countries, as well as nearby seaports; and (ii) develop an integrated transport network that caters for different cargo.

The existing Uzbek railway network stops at the border town of Hairatan. This is a gateway to Afghanistan, but it has reached its full capacity (4,000 tons of cargo per month). The flow of goods from Central Asia to Afghanistan will increase from 25,000 tons to 40,000 tons per month over the next few years. To prevent bottlenecks at the border, the existing Uzbek railway at Hairatan needs to be extended into Afghanistan, in a first intervention, to Mazar-e-Sharif. At a later stage, the railway network will be extended to Herat in the west and Tajikistan in the east. The railway will service commercial and non-military cargo.

The project is a priority one for Afghanistan. It fits with its Railway Development Plan. It is closely linked to ADB’s Country Partnership Strategy for 2009-2013, which identifies the construction and rehabilitation of national roads and railways as a priority. It is also consistent with the CAREC Transport and Trade Facilitation Strategy.

The infrastructure:

The Project outputs will be (i) around 80kms railway line from Hairatan to Mazar-e-Sharif with support facilities including rail/road connections and terminals constructed; (ii) established signaling and management information system; (iii) productive use of available land and social safeguarded; (iv) safeguarded and protected environment along railway corridor; (vi) strengthened institutions and management capacity.
Source: Asian Development Bank

Meanwhile, New rail line between Uzbekistan, Afghanistan to serve strategic purpose, reports Central Asia Online:

The construction of the 67km-long line is included in a memorandum of understanding to expand trade and economic opportunities that was recently signed by Uzbekistan, Afghanistan and the Asian Development Bank.

A technical team from Uzbek Railway is scheduled to arrive in Afghanistan shortly to prepare for construction. The cost of the project is estimated to be US$120 million, an amount that will provided by the Asian Development Bank. Construction is tentatively slated to begin in December.
Source: Central Asia Online, 2009-08-29

Mazar-i-Sharif railway work to start by end of year

A report from a Chinese news agency saying work is to start imminently on extending the Uzbekistan – Hayratan railway line by 60 km to Mazar-i-Sharif.

Unfortunately the website of the Ministry for Commerce and Industries is “under maintenance” so I can’t check the source. The Rah-e-Nejat also has a website, but I can’t find the story using Google translate.

In the past there have been reports claiming that the German military is keen to see this line built, for bringing in supplies to German forces in Afghanistan. Presumably the line would be built to 1520 mm gauge, for compatability with the Uzbek rail network.

Construction of first railway in Afghanistan to begin within 4 months

KABUL, Aug. 13 (Xinhua) — Work for the construction of first Afghan railway to begin within the next four months, a local newspaper reported Thursday.

The essential project, costing 120 million U.S. dollars, would connect Uzbekistan to Mazar-e-Sharif city in north Afghanistan, the daily Rah-e-Nejat quoted a press release of Ministry for Commerce and Industries as reporting.

Afghanistan’s border town Hairatan is connected with Uzbekistan and the work for 60 km railway would begin from Hairatan possibly in this December, the newspaper further said.

A technical team from Uzbekistan would soon visit Afghanistan in connection with the project which is financed by the Asian Development Bank, the newspaper added.
Source: Xinhua 2009-08-14

(thanks to Michael G Erickson for spotting this)

“Quite a sight to see a train in operation”

A 12 October 2008 posting on Free Range International, a blog with some fascinating on-the-ground reports and thoughts from Afghanistan:

Two days ago, I traveled to Hairatan which is located approximately 65km north of Mazar-e-Sharif. It is also located on the Amu Darya river (formerly know as the Oxus River) which is the longest river in Central Asia. For someone like myself who has never operated any where else other than the southern or eastern parts of the country, it sure came across as a bit of a surprise.

One of the most striking impressions that I got was seeing an operating freight rail system. After being to most corners of Afghanistan, and only witnessing ‘Jingle’ trucks and semi-trailers it was quite a sight to see a train in operation. The main purpose of the train is transporting fuel, which is imported from Uzbekistan.
Source: Free Range International

There are a couple of big pictures showing the Friendship Bridge and (presumably Uzbek Railways) locomotive TEM2-3315 in operation at Hayratan.

Problems with the Northern Supply Network

EurasiaNet has an interesting report by Deirdre Tynan, a freelance journalist specialising in Central Asian affairs, which discusses problems with the US plan to supply military forces in Afghanistan by rail from the north. I’ve highlighted some key bits.

The report includes a quote from David Brice, a international railway consultant who was in Afghanistan in 2005 working on a capacity increase and re-equipment study for freight lines.

One puzzling thing is the reference by a Russian Railways spokesman to the widening [of the narrow gauge tracks] at Galaba-Hairaton on the Uzbek-Afghan border. As the Soviet-built railway tracks at Hayratan in Afghanistan are only connected to wider world via the bridge with Uzbekistan, it seems pretty unlikely that the tracks are anything other than the 1520 mm broad gauge used across the former USSR and into some neighbouring countries. There would be little point in having built just the terminal to standard (1435 mm) or even a true narrow gauge.

CENTRAL ASIA: NORTHERN SUPPLY NETWORK FOR AFGHANISTAN HITS SNAGS


Deirdre Tynan 7/23/09

The Northern Distribution Network, an American-assembled logistical pipeline designed to ease and expand the flow of supplies to coalition forces in Afghanistan, is off to a lackluster start.

The land routes for the delivery of non-military goods from Europe to Afghanistan via Central Asia provided just over 250 containers between June 5 and July 14. That total is far short of the number originally envisioned by military planners. During a Senate hearing in March, Gen. Duncan McNabb, the head of TRANSCOM, the military’s transport wing, predicted that the NDN would transport “hundreds of containers” per day.

The existing rail route, which begins in Riga, Latvia, and ends at border points in Uzbekistan and Tajikistan, appears to be experiencing bottlenecks and other problems. On June 5, TRANSCOM officials told EurasiaNet, “We have shipped roughly 750 containers of construction material and other general supplies for US forces in Afghanistan through the NDN, which includes the original ’proof of concept’ shipment of about 200 containers. ”

“With the appropriate transit agreements in place, the US Transportation Command began using existing rail and road infrastructure in mid-May,” the Transcom statement added. “It is important to note that no additional construction was necessary and the NDN utilizes commercial companies from origination to destination.”

On July 14, TRANSCOM said, “For obvious operational security reasons, we cannot provide geographic and time-sensitive specifics of moving military cargo. But to update information previously provided, the US has shipped more than 1,000 containers of non-lethal cargo, such as construction materials and other general supplies, along the Northern Distribution Network.”

In June and July, according to publicly available data, only seven containers a day on average were arriving in Afghanistan via the NDN. A commercial source, speaking on condition of anonymity, characterized the performance as “ridiculous.” Railway experts have also questioned whether the Uzbek rail route, which crosses the Afghan border at Termez-Hairaton, is capable of handling the amount of traffic envisioned by the US military and its allies.

David Brice, an international rail consultant who made recommendations on upgrading the capacity of Hairatan two years ago, said the depot remains under-equipped to deal with a large volume of traffic. “There will certainly be a capacity problem in the Termez-Hairatan section, which two years ago was handling its full capacity of three or four trains daily without the US traffic,” Brice said.

“Three-quarters of the terminal area was disused and the working area very badly equipped for its task,” he told EurasiaNet in an interview. “The ideal route for this traffic would be deep sea via Bandar Abbas and the new Iranian rail line being built from Sangan to Herat. It’s a massive problem, though, due to the current political tension between the United States and Iran.”

Given the complexities of overland operations, an air-transit deal for arms and military equipment, struck by Presidents Barack Obama and Dmitry Medvedev in Moscow in early July, appears to be an important breakthrough. However, America’s partners in the region say similar arrangements with the United States have not been negotiated.

Daniyar Mukataev, a spokesman for the Kazakh Ministry of Transport and Communications said, “There are no agreements or talks between Kazakhstan and the United States on the transit of military cargoes through the territory of Kazakhstan. After reaching agreement with Russia, they now have to talk with Kazakhstan and then with Uzbekistan on the transit of military cargoes. But for the moment the agreement with Russia is just empty words.”

When EurasiaNet asked the US State Department if attempts were being made to secure military transit agreements with the Central Asian states, the press office did not respond directly to the question, referring instead to Under Secretary of State William Burn’s remarks publicized during his early July trip to Central Asia. Burns told reporters in Ashgabat, Astana, Bishkek and Tashkent, that Washington looked forward to “new ways of working together.”

Some regional observers suggest the United States may have underestimated the complexities, both political and logistical, of establishing the NDN. “We have to realize that this network implies crossing of the borders of several states and every transit country is looking out for its own material interests,” said Andrei Grozin, the director of the Central Asia Department at the CIS Institute in Moscow.

“Frankly speaking, this is one of the main reasons why the system is not set up properly and not working well,” Grozin continued. “There are of course objective reasons such as the complexity of the system itself. But, mostly it’s all about the borders, the financial interests of the transit countries, and corruption in these countries.”

Central Asian leaders publicly express concern about the security threats originating from Afghanistan, but, although they don’t say so openly, the NDN is also seen as a lucrative opportunity, Grozin said. “The United States understands that for solving its geopolitical and other problems, it has to pay,” he added.

But many experts are asking: is Washington overpaying? Several indicators would seem to suggest that the Pentagon’s tendency to throw money at the problem is not producing desired results. Not only is the rail network not delivering as expected, financially speaking it’s shaping up as something of a boondoggle.

Russian and Uzbek companies are reorganizing their structures to take maximum advantage of the Pentagon’s commercial approach to the NDN. In a move designed to get the network up and running quickly, defense officials eased tender rules to allow for lucrative contracts to be granted with no competitive oversight. That has seemed to stimulate a feeding frenzy among regional transport entities.

Russian Railways, for example, has confirmed to EurasiaNet that it is seeking a grant from the US government to upgrade the Termez-Galaba-Hairaton border crossing between Uzbekistan and Afghanistan.

A spokesperson for Russian Railways said on July 9, “We can confirm that Russian Railways seriously addresses the issue of modernization at Galaba-Hairaton on the Uzbek-Afghan border to transit American goods from Riga [Latvia] to the border with Afghanistan. Also, a proposal was sent to Ministry of Foreign Affairs of Russia on the need to involve US participation in the financing of the widening [of the narrow gauge tracks] at Galaba-Hairaton on the Uzbek-Afghan border.”

Neither the Russian Ministry of Foreign Affairs nor the US State Department would elaborate on the information provided by Russian Railways.

Source:Eurasia Insight 2009-07-23

[Copyright © 2009 Open Society Institute. Reprinted with the permission of the Open Society Institute, 400 West 59th Street, New York, NY 10019 USA, www.EurasiaNet.org]

Hayratan – Mazar-i-Sharif railway plan

Text of report by privately-owned Afghan Arzu TV on 18 June, reported by BBC Monitoring South Asia, 2009-06-19.

Rail Road Project to Link North Afghanistan to Uzbekistan

[Presenter] After a short time, new rail road will be built from Uzbekistan to Hayratan border town and from Hayratan to Mazar-e Sharif city, says Minister of Commerce and Industries Wahidullah Shahrani in a meeting with Uzbek railway minister in Hayratan border town. Mr Shahrani said rail road’s designing and technical procedure had been started and will be completed in nine months. He added Asian Development Bank will donate 100m dollars for building the rail road and a logistic station in Mazar-e Sharif city and Uzbekistan will cooperate in its technical procedure.

[Correspondent] Minister of Commerce and Industries Wahidullah Shahrani visited Hayratan border town of Balkh Province to meet Uzbek minister of railway and speak about building a rail road between Uzbekistan and Mazar-e Sharif city. The minister said building a railway from Hayratan border town to Mazar-e Sharif city costs 80-120m dollars, its technical and designing procedure costing 1.2m dollars will be completed after nine months. The project is funded by Asian Development Bank.

[More]

Third Regional Economic Cooperation Conference on Afghanistan

Islamabad Declaration

The delegates participating in the Third Regional Economic Cooperation Conference on Afghanistan having met in Islamabad on 13 – 14 May 2009:

NOTE THAT
Transport, Trade, Energy Cooperation, Agricultural Cooperation, Capacity Building and Education, Border Management, Health, Counter Narcotics and Refugee Return and Reintegration are areas with considerable scope for mutually beneficial regional cooperation.

Connectivity: Increased trade in the region will be facilitated by affording Afghanistan easy accessibility to the Sea, developing east-west and north-south corridors on the basis of mutual agreement, and further developing infrastructure links with Afghanistan and its neighbours.

Railway connection between Iran and Herat is already on going on the basis of a grant from the Government of Islamic Republic of Iran.

An 80 km railway link from Hairatan (on the Uzbekistan border) to Mazar-e-Sharif is considered a priority route for development. The planned link forms part of CAREC’s Transport and Trade Facilitation Strategy, and is in accordance with Afghanistan’s Railways Development Programme. The project will be developed with Asian Development Bank grant support.

HAVE DECIDED THAT


4. High priority will be accorded, in terms of resource allocation and political commitment to the following set of practical short-term projects of benefit to Afghanistan and the region:
a. Concluding negotiations of the Afghanistan Pakistan Trade and Transit Agreement before the end of 2009, as agreed earlier this month in Washington, DC.
b. Extension of rail link from Chaman to Kandahar.
c. In addition, the European Commission will conduct a pre-feasibility study of railways across Afghanistan linking major destinations within Afghanistan and its neigbours.

Read in full on the Ministry of Foreign Affairswebsite.

(thanks to Michael G Erickson for sending me a link)

Military transport routes to Afghanistan

An interesting 17 February 2009 article from Der Spiegel about the problems of supplying military forces in Afghanistan. This problem is nothing new of course – various armies over the centuries have faced it before.

Allies Struggle to Find Safer Supply Routes

By Dieter Bednarz, Rüdiger Falksohn and Alexander Szandar

The Taliban has staged repeated attacks on Afghanistan’s perilous Khyber Pass against trucks loaded with NATO supplies. The international security forces, including Germany’s Bundeswehr, are scrambling to find safer routes – and might even consider one through Iran.

Interesting bits

  • Three-quarters of all the military equipment and goods for Afghanistan goes through Karachi.
  • Germany is the only NATO country with permission to transport war materiel through Russia by rail. But other countries, including Kazakhstan and Uzbekistan, have refused permits so no trains have actually run.

The Bundeswehr has also looked into the feasibility of building additional stretches of track in Afghanistan. There are already 20-year-old plans from the days of the Soviet occupation. The railroad could connect the border town of Hairatan with Mazar-e-Sharif, 67 kilometers away. Thanks to a bridge built in 1982 across the Amu Darya River, which serves as the border between Afghanistan and Uzbekistan, Hairatan has a direct connection to the rail network in Termes.

The financing is still up in the air, though. But given that the project would both make it easier to bring supplies to NATO troops and promote the region’s economy, military officials hope to receive funds from the German Federal Ministry for Economic Cooperation and Development and international organizations. For example, the Asian Development Bank plans to prepare a feasibility study with the support of the Uzbek government.

In December, a privately owned Uzbek railroad company, which already operates in Afghanistan’s Herat Province, contacted the German Embassy in Kabul. According to a confidential report the embassy sent to the German Foreign Ministry in Berlin, the Uzbek company “would like to work with German companies” to implement projects sponsored by the development bank.
Source: Der Spiegel

Iran to Afghanistan railway completed ‘in the next 5 years’

Afghan website Quqnoos reports on the Iran — Herat railway construction project. There is a photograph of some railway track, but it could be a stock picture rather than evidence of the work being underway.

Plans to extend the line from Herat to serve the existing railheads are mentioned.

Afghanistan’s railway project which will connect Shirkhan harbor with the western province of Herat will cost $2 billion.

The project which is planned to be completed in the next five years will connect Central Asia with Iran via Afghanistan.

Construction work on the project, from Herat to Iran, has already started. The design of the rest of the railway network from Herat to the Shirkhan commercial transit way is also in late planning stage.

The railway network which will be about 1200 km long will connect Afghanistan’s Shirkhan, Hairatan, Aqina and Torghondi commercial highways with the commercial harbors in the central Asian countries.

Meanwhile the media in Tajikistan have reported that work has begun on a railway network which will link Klokhabad with Panjpayan, on the border with Afghanistan.

Source: Quqnoos.com 2009-01-19

Iran building rail links to Iraq and Afghanistan

Network expansion is in full swing is an article about the Iranian rail network in the January 2009 issue of Railway Gazette International.

The author is railway consultant David Brice, who has worked on transport projects in Afghanistan, including at the Hayratan terminal.

Work is currently well in hand on extension of RAI’s Torbat – Sangan iron ore line across the border to Herat in Afghanistan (RG 1.08 p55). Whilst perhaps not a major development in terms of generating traffic, this line certainly has major political implications. Largely financed by the Iranian government, it will constitute the first major standard-gauge line in Afghanistan.

A further extension to Sher Khan Bandar serving the northeast of Afghanistan is currently under investigation, and on November 23 2008 the Asian Development Bank announced that a protocol had been signed highlighting the importance of developing rail links from Herat through Mazar-i-Sharif as far as the current Uzbekistan Railways railhead at Hayratan, reached by a 1 520 mm gauge line from Termez. The Afghan government has requested technical and financial assistance from ADB for a pre-feasibility study.

A proposed extension of this route beyond Sher Khan Bandar along the Wakhan Corridor, albeit through challenging terrain, could complete a direct connection from Iran to the rapidly expanding Chinese rail network, creating a standard-gauge through route between Europe and China.
[…]

Iran – Iraq. Two links to Iraq are in hand, one from Khorramshahr to the port of Basra, and the other from Arak via Kermanshah to the Iraqi border at Kosrayi. This will cater for substantial flows of pilgrimage traffic once the political situation has normalised.

Source: Railway Gazette International

Consultants wanted for ABD study of northern Afghan rail plan

Asian Development Bank is seeking consultants to look into the development of a freight and passenger rail network in northern Afghanistan. The route would link the existing line from Uzbekistan with Herat.

The Japan Special Fund is providing USD1.2 million for the eight-month study, with a tentative start date of 1 May 2009.

Afghanistan: Railway Development Program / Package T1: A team of experts is envisaged to be recruited

Closing date: 24-1-2009
Notice number: 42533-01
Abstract:Railway Development Program

The objective of the study is to respond to the Government of Afghanistan’s request to carry out studies of the possible railway linkage in the northern part of the country within approximately 1250 km corridor.
More specifically between the borders with Uzbekistan (at Hairatn) and Tajikstan (at Shirkhan Bendar) connecting with Herat in the West via Kunduz and Mazar e Sharif.

A team of experts is envisaged to be recruited to carry out issues-oriented studies and develop a commercial scenario for effective freight and passenger railway transport and provide the required output in a timely fashion.

The respective consultants will review the available studies undertaken in the respective areas, meet with the stakeholders and business people the requirements and discuss the prospects of the railway system for the transportation of passengers and freight operations in that part of the country.

The consultants will collect necessary data, carry out required field surveys and produce development program and plans.

Source: EVD